2022 URD - SW 10th Street Reconstruction Project

Project Type:
Street
Project Status: 
Completed
  • Estimated Engineering Cost: $349,020.00
  • Contractors Cost: $339,332.00

What work is being performed?

  • Curb and gutter will be removed and replaced, as needed, to address drainage issues.
  • Sidewalks will be removed and replaced, as needed, to install the new curb and gutter, to address safety issues, and to ensure compliance with ADA standards.
  • ADA ramps will be installed to meet Federal ADA standards.
  • Catch basins and storm water pipe will be installed to improve and address drainage issues.
  • Roadway will be completely reconstructed to address subgrade failure.