Page not found
Search results
-
Drying Beds Improvements Project
Public Works | Bid/RFP Construction Schedule Information for Bidders- Page 2 of 3 CLASSIFICATION.. BOLi WAGE RATE WORKSHEET BOLi ... on Tuesday, March 15, 2022, at the regularly scheduled City Council meeting, 7:00 pm, City Hall, 500 ... Wage Rate Worksheet (indicating BOLI Wage Rates used for the project) o Example worksheet attached ...
-
EORA- Runway 29 Threshold Relocation, New Taxilanes and Apron Rehabilitation
Public Works | Bid/RFP Prevailing Wage Rates Drawings PRECISION APPROACH ENGINEERING, INC. Corvallis, Oregon March 2022 PAE ... WAGE RATES Federal Davis-Bacon Wage Rates are attached, and are available at: ... https://sam.gov/content/wage-determinations State of Oregon Prevailing Wage Rates are attached, and are available at Oregon.Gov: ...
-
SW Houtama Road Water Line Project
Community Development | Bid/RFPSubmittals Schedule of Values Wage Rate Worksheet (showing BOLI and Davis-Bacon Rates – highest of two ... 2021, at the regularly scheduled City Council meeting The work to be performed under these separate ... at the rate of one percent (1%) per calendar day of the price of the contract work not yet completed ...
-
EORA- Runway 29 Threshold Relocation, New Taxilanes and Apron Rehabilitation Project
Public Works | Bid/RFPItems Technical Specifications Prevailing Wage Rates Drawings PRECISION APPROACH ENGINEERING, INC. ... Contents New Taxilanes and Apron Rehabilitation SECTION VI – PREVAILING WAGE RATES Federal Davis-Bacon Wage ... Rates are attached, and are available at: https://sam.gov/content/wage-determinations State of Oregon ...
-
Lodging Taxes
Finance | Pageadministrative fee authorized to be retained. Transient lodging tax collectors may choose to file returns and ... accompanied by remittance of all tax collected, less a five percent administration fee. The return shall be ... transient lodging tax collector is entitled to the administration fee. If a transient lodging facility has ...
-
UAS Flex Hangar 3- Architectural Services
Community Development | Bid/RFPwater, sewer, and electricity are located in the adjacent road. 3. Selection Process and Schedule: An ... qualifications with hourly rates and probable budgets from licensed and qualified architectural firms for the ... • Construction Administration: During construction, attend job-site meetings in person and/or via Zoom or Teams, ...
-
Community Development
Community Development | Pagestaff. Building Department The Building Department provides administration of permitting programs for ... provides administration of development or activities within public infrastructure. The reviewing of plans, ... surveys, and utility records. Planning Department Planning/Zoning provides administration of the ...
-
Manufactured Dwelling/Recreational-Park Trailer Placement Permit Application
Community Development | PageWidth Serial Number Model Year Valuation FEE SCHEDULE Description Cost ea. Qty. Total Dept. Use (1) ... installer. (a) Surcharge, 12% (.12 x [1+3 or 2+3]): 70411/1291 (b) Administrative fee for item (1) only: ... Manufactured dwelling Placement (includes placement, electrical feeder, water/sewer connection): $164.80 ...
-
SW 41st Street Parking Lot Project
Community Development | Bid/RFPlink. A paper copy of the bid documents may be obtained for a non-refundable fee of $50.00 from the ... wage rates, if the project exceeds $50,000, in effect on January 5, 2023, including any amendments, as ... stated in the Prevailing Wage Rates for Public Works Contracts published by the Oregon Bureau of Labor ...
-
Well No. 11B Drilling Project
Public Works | Bid/RFPof Submittals Schedule of Values Wage Rate Worksheet- indicating BOLI and Davis-Bacon Rates used ... obtained for a non-refundable fee of $50.00 plus shipping from the Public Works Director’s Office located ... applicable prevailing wage rates in effect on July 1, 2022, including any amendments, as stated in the ...