Page not found

Search results

  1. Lodging Taxes

    Finance | Page

    Company name of transient lodging intermediary_6: Address_6: fill_29: fill_30: fill_33: fill_34: Text1: ... improvement project of the Convention Center which was constructed beginning in 2014 and was funded with ... exercises occupancy or is entitled to occupancy in transient lodging for a period of 30 consecutive calendar ...

  2. Housing and Neighborhood Improvement Committee

    Housing and Neighborhood Improvement Committee | Page

    census 2014 estimates 2000- 2014 19 and under 4,345 27% 4,199 25% 4,275 25%-2% 20 to 34 3,707 23% 3,725 ... ...............................................................................................34 d) Gaps in the rental ... <$15,000 13.2% 13.4% $15,000- $24,999 10.4% 10.0% $25,000- $34,999 12.6% 11.6% $35,000- $49,999 12.0% 12.5% ...

  3. Fee Schedule

    City Recorder | Page

    $65.00 per hour, Minimum of 1 hour 34 Reinspection $65.00 each 35 Each additional inspection, above ... Vent 31 Wood / Pellet stove 32 Other heating/cooling 33 Other fuel appliance 34 Other envoronment ... Urinal 33 Water closet / toilet 34 Water heater 35 Other- plumbing 36 Alternate potable water heater 37 ...

  4. City of Pendleton Annual Audited Financial Reports

    Finance | Page

    of Revenues, Expenses, and Changes in Fund Net Position – Proprietary Funds 34 Reconciliation of the ... $34,099, while Sewer and Airport both saw expenditures decrease from the prior year. • The unassigned fund ... $42,122,332 $34,037,295 (8,085,037) Deferred Inflow of Resources $1,397,772 $10,523,957 $9,126,185 Net ...

  5. Documents

    Public Works | Page

    3.4% 7.2% 15.6% 26.2% Poor (IV) 25-50 2.4% 5.8% 15.0% 23.1% Very Poor (V) 0-25 0.0% 2.0% 5.6% 7.6% ... Backlog $31,635,476 $33,152,895 $34,270,039 $36,109,739 $38,581,232--- PCI 57 56 55 54 53 Figure 6. ...

  6. Employment Application

    Human Resources | Page

    Employment Application Employment Application application-fillable.pdf Revised March 2014 ... subject to recall? Yes No Can you travel if a job requires it? Yes No Revised March 2014-2- EDUCATION AND ... for Leaving Revised March 2014-3- Employer Kind of Business Address (Including City & State) ...

  7. EORA- Runway 29 Threshold Relocation, New Taxilanes and Apron Rehabilitation

    Public Works | Bid/RFP

    nonrefundable. Printed and bound sets of Drawings (22” x 34”) may be obtained from Precision Approach ... sets of Drawings (22” x 34”) may be obtained from Precision Approach Engineering, Inc., 5125 SW Hout ... Apron Rehabilitation a period of 120 calendar days after bid opening, and that if awarded the Contract, ...

  8. EORA- Runway 29 Threshold Relocation, New Taxilanes and Apron Rehabilitation Project

    Public Works | Bid/RFP

    nonrefundable. Printed and bound sets of Drawings (22” x 34”) may be obtained from Precision Approach ... sets of Drawings (22” x 34”) may be obtained from Precision Approach Engineering, Inc., 5125 SW Hout ... Apron Rehabilitation a period of 120 calendar days after bid opening, and that if awarded the Contract, ...

  9. Cemetery Service Planning Form

    Parks & Recreation | Webform

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 ... edit-submitted-loved-ones-information-date-of-passing-year Year 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 ... 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 Desired Service Time ...

  10. Connector Road Waterlines Project

    Public Works | Bid/RFP

    at the rate of one percent (1%) per calendar day of the price of the contract work not yet completed ... for all Bid Items, or $500 per calendar day, whichever is greater, for work not completed on or by ... timeframes noted in red below: Contract Forms and Submittals Required by City – within ten (10) calendar days ...

Pages