Page not found
Search results
-
Lodging Taxes
Finance | PageCompany name of transient lodging intermediary_6: Address_6: fill_29: fill_30: fill_33: fill_34: Text1: ... improvement project of the Convention Center which was constructed beginning in 2014 and was funded with ... exercises occupancy or is entitled to occupancy in transient lodging for a period of 30 consecutive calendar ...
-
Housing and Neighborhood Improvement Committee
Housing and Neighborhood Improvement Committee | Pagecensus 2014 estimates 2000- 2014 19 and under 4,345 27% 4,199 25% 4,275 25%-2% 20 to 34 3,707 23% 3,725 ... ...............................................................................................34 d) Gaps in the rental ... <$15,000 13.2% 13.4% $15,000- $24,999 10.4% 10.0% $25,000- $34,999 12.6% 11.6% $35,000- $49,999 12.0% 12.5% ...
-
Fee Schedule
City Recorder | Page$65.00 per hour, Minimum of 1 hour 34 Reinspection $65.00 each 35 Each additional inspection, above ... Vent 31 Wood / Pellet stove 32 Other heating/cooling 33 Other fuel appliance 34 Other envoronment ... Urinal 33 Water closet / toilet 34 Water heater 35 Other- plumbing 36 Alternate potable water heater 37 ...
-
City of Pendleton Annual Audited Financial Reports
Finance | Pageof Revenues, Expenses, and Changes in Fund Net Position – Proprietary Funds 34 Reconciliation of the ... $34,099, while Sewer and Airport both saw expenditures decrease from the prior year. • The unassigned fund ... $42,122,332 $34,037,295 (8,085,037) Deferred Inflow of Resources $1,397,772 $10,523,957 $9,126,185 Net ...
-
Documents
Public Works | Page3.4% 7.2% 15.6% 26.2% Poor (IV) 25-50 2.4% 5.8% 15.0% 23.1% Very Poor (V) 0-25 0.0% 2.0% 5.6% 7.6% ... Backlog $31,635,476 $33,152,895 $34,270,039 $36,109,739 $38,581,232--- PCI 57 56 55 54 53 Figure 6. ...
-
Employment Application
Human Resources | PageEmployment Application Employment Application application-fillable.pdf Revised March 2014 ... subject to recall? Yes No Can you travel if a job requires it? Yes No Revised March 2014-2- EDUCATION AND ... for Leaving Revised March 2014-3- Employer Kind of Business Address (Including City & State) ...
-
EORA- Runway 29 Threshold Relocation, New Taxilanes and Apron Rehabilitation
Public Works | Bid/RFPnonrefundable. Printed and bound sets of Drawings (22” x 34”) may be obtained from Precision Approach ... sets of Drawings (22” x 34”) may be obtained from Precision Approach Engineering, Inc., 5125 SW Hout ... Apron Rehabilitation a period of 120 calendar days after bid opening, and that if awarded the Contract, ...
-
EORA- Runway 29 Threshold Relocation, New Taxilanes and Apron Rehabilitation Project
Public Works | Bid/RFPnonrefundable. Printed and bound sets of Drawings (22” x 34”) may be obtained from Precision Approach ... sets of Drawings (22” x 34”) may be obtained from Precision Approach Engineering, Inc., 5125 SW Hout ... Apron Rehabilitation a period of 120 calendar days after bid opening, and that if awarded the Contract, ...
-
Cemetery Service Planning Form
Parks & Recreation | Webform2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 ... edit-submitted-loved-ones-information-date-of-passing-year Year 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 ... 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 Desired Service Time ...
-
Connector Road Waterlines Project
Public Works | Bid/RFPat the rate of one percent (1%) per calendar day of the price of the contract work not yet completed ... for all Bid Items, or $500 per calendar day, whichever is greater, for work not completed on or by ... timeframes noted in red below: Contract Forms and Submittals Required by City – within ten (10) calendar days ...